Microphysics flight report 08/24
Flight Date:
Tuesday, August 24, 2010
We collected good data with CAPS, CDP, and RICE, including a high altitude
spiral descent/ascent (30-40K feet), and many long level legs in convective anvils.
The PIP laser failed about 1.5 hours after take-off during a convective pass and was
not operational for the remainder of the flight. The instrument has been shipped for
repair and is expected to be ready for a potential Saturday flight.
CSI not flown.
Status:
Yellow