Instrument Debrief for AMPR
Sortie Number: 05-9034
Instrument Performance:
AMPR performed similarly to previous flights, although less noise is apparent now than in the last few flights. Navigation still needs to be added, and a timing error corrected. Calibrated brightness temperatures will be produced after the deployment.
Difficult to tell much about the TD Gert pattern until navigation data is added. It looks like we had clear conditions for the Aqua underpass, as planned.