May 7 POD

MC3E banner

May 7 POD

Date: 
Sat, 05/07/2011

ER-2 Gulf of Mexico calibration flight.  Takeoff at 1800 UTC, 2 hour ferry, 1 hour sampling, 2 hour return.

Radio check at SGP as the ER-2 heads south.  

Sunday plan to do the LSM mission with*potential* convection mission on the back side of the flight  if the cap breaks  Will notify ER-2 ops on fuel loading by 10 AM CDT (for a potential full mission).  The LSM flight track and timing (recycled from earlier May 6 plans) is attached.

Citation will be on alert Sunday to TBD for potential convective missions on short notice.

 

Walt P. / Dan C. / Larry C.

Attachment Size
ER2_MC3E_7May_Chart.pdf 1.05 MB
ER2_MC3E_8May_Chart.pdf 2.93 MB
ER2_MC3E_8MAY.pdf 27.17 KB

 

Have you used our data? Register for updates