May 7 POD
ER-2 Gulf of Mexico calibration flight. Takeoff at 1800 UTC, 2 hour ferry, 1 hour sampling, 2 hour return.
Radio check at SGP as the ER-2 heads south.
Sunday plan to do the LSM mission with*potential* convection mission on the back side of the flight if the cap breaks Will notify ER-2 ops on fuel loading by 10 AM CDT (for a potential full mission). The LSM flight track and timing (recycled from earlier May 6 plans) is attached.
Citation will be on alert Sunday to TBD for potential convective missions on short notice.
Walt P. / Dan C. / Larry C.
Attachment | Size |
---|---|
ER2_MC3E_7May_Chart.pdf | 1.05 MB |
ER2_MC3E_8May_Chart.pdf | 2.93 MB |
ER2_MC3E_8MAY.pdf | 27.17 KB |