20Aug2010 14Z Daily GRIP Telecon

GRIP Banner

20Aug2010 14Z Daily GRIP Telecon

Flight Date: 
Fri, 08/20/2010
Sortie Number: 
none

20 Aug 2010

GRIP FLL-JSC-DFRC 14Z Daily Telecon/Webinar

 

Participants

FLL Team – Halverson, McFarquhar, Goodman, Molinari, Braun

Aaron Bansemer, Simone Tanelli, Paul Bui, Michael Kavaya, Luke Ziemba

 

Telecon 

Tim Miller, Gary Wick, Sue Tolley, Gerry Heymsfield, Michael Black, Bjorn Lambrigtsen, Dave Jordan

 

Global Hawk Report

  • Droposonde - installed;
  • Installed – working on intermittent IR comm problems
  • If comm solved they will do a Combined Systems Test otherwise CST on Saturday
  • Phil Hall still working COA dropsonde – hopefully resolved favorably
  • HAMSR – green.  Worked very well. Fine tuning
  • LIP - green
  • HIWRAP – yellow but can still fly; software / hardware (bad board or connector) problems

 

Friday – Combined System Test

Saturday –  Range Test

Tuesday – high altitude drop test in Range

 

WB-57 Report

  • HIRAD delayed on data system upgrades. Ship on 23Monday; Arrive on Wednesday, Fly on Thursday as a checkout unless target is in the Gulf.  Friday, 27Aug is first science
  • AMPR arrives on 7Sept
  • WB-57 Suitcase flights will be out of MacDill AFB, Tampa FL
  • NAST-I IR interferometer will piggyback during the beginning – don’t have budget for extended

 

DC8 Report

Aircraft status – green. 

  • LASE – green. Very good shape
  • LARGE – green.  Calibration on the plane today
  • APR2 – green. 
  • DAWN –  insulation fix completed.  Will test on first flight opportunity.
  • LaRC personnel working on alternative solutions (adding a fan and heat source in the can – no de-integration required)
  • Microphysics – all but CSI are green.  CSI awaiting pylon remanufacture at least another week
  • MMS – green.
  • Dropsonde – green.

 

Currently entertaining a suitcase flight to St. Croix to intercept a combined PGI-31&33

Ferry on Tuesday to St. Croix followed by two 10hr flights on Wed & Thur followed by a no-fly on Friday.

Go/No Go decision on Sunday (48hr notice to get hotels)

Attachment Size
GRIP telecon 14z_20Aug2010.docx 99.3 KB

 

Have you used our data? Register for updates